State Guide 12 min read

Telangana Data Center Power Tariff 2026: Complete Breakdown

TGSPDCL tariff analysis for Hyderabad data centers — including the critical winter rebate suspension, kVAh billing impact, and why costs are 24% higher for night operations in Feb 2026.

Telangana has been one of India's most attractive data center markets, with Hyderabad hosting investments from AWS, Microsoft, Google, CtrlS, and Yotta. However, February 2026 presents a critical cost disruption: the suspension of the night-time ToD rebate has pushed operating costs significantly higher.

CRITICAL ALERT (Feb 2026): TSERC has suspended the night ToD rebate (-₹1.50/kVAh) for December 2025 through March 2026. Night-time energy costs have increased by 24.4% (from ₹6.15 to ₹7.65/kVAh). Standard rebate expected to resume April 2026.

Quick Reference: Telangana HT Industrial Tariff (FY 2025-26)

Component Rate Notes
Base Energy Rate (11 kV) ₹7.65/kVAh Apparent energy billing
Base Energy Rate (33 kV) ₹7.15/kVAh Discount for higher voltage
Base Energy Rate (132 kV+) ₹6.65/kVAh Heavy industries
Demand Charge ₹500/kVA/month All voltage levels
Customer Charges ₹2,000 - ₹5,000/month ₹2K (11kV), ₹3.5K (33kV), ₹5K (132kV)
FAC Negligible For Feb 2026
Electricity Duty 5%
CSS (Open Access) ₹1.82/kWh High floor for OA adoption

The "Winter Shock": Night Rebate Suspension

In a significant deviation from the standard RST Order, TSERC approved an amendment to suspend the night-time ToD rebate for December 2025 through March 2026. The rationale:

  • Thermal Backing Down Costs: During winter nights, demand crashes. Discoms must back down thermal stations to technical minimums, incurring compensation costs while still paying for must-run renewables.
  • Revenue Gap: The rebate was causing a revenue leak during months when the system did not need load shifting (night demand is naturally low in winter).

Time-of-Day (ToD) Structure (February 2026)

Time Slot Hours Standard (Apr-Nov) Feb 2026 (Amended) Effective Rate (Feb '26)
Morning Peak 06:00 - 10:00 +₹1.00 +₹1.00 ₹8.65/kVAh
Day Normal 10:00 - 18:00 Base Rate Base Rate ₹7.65/kVAh
Evening Peak 18:00 - 22:00 +₹1.00 +₹1.00 ₹8.65/kVAh
Night 22:00 - 06:00 -₹1.50 ₹0 (SUSPENDED) ₹7.65/kVAh
Impact Calculation: For a continuous process facility, the loss of the ₹1.50 rebate for 8 hours/day represents a massive cost escalation:

Previous night cost: ₹7.65 - ₹1.50 = ₹6.15/kVAh
Feb 2026 night cost: ₹7.65/kVAh
Increase: 24.4% for night-time energy costs

kVAh Billing Impact

Like Maharashtra, Telangana uses kVAh (Apparent Energy) billing. Industries with poor power factor correction are double-penalized — once by the physics of kVAh (higher billing units) and again by the high energy rate.

Power Factor kVAh per kWh Effective Cost per kWh Premium
1.00 1.000 ₹7.65 -
0.98 1.020 ₹7.81 +2.0%
0.95 1.053 ₹8.05 +5.3%
0.90 1.111 ₹8.50 +11.1%

Why Hyperscalers Choose Hyderabad

Despite the winter tariff disruption, Hyderabad's long-term fundamentals remain strong:

  • AWS: Multiple availability zones in Hyderabad region
  • Microsoft Azure: Hyderabad data center region
  • Google Cloud: Planned Hyderabad region
  • CtrlS: Largest tier-4 data center in Asia (Hyderabad)
  • Yotta: 20 MW+ facility in Hyderabad

State Incentive Programs

  • Power tariff subsidy: Additional rebates for anchor investments (>50 MW)
  • Single-window clearance: Expedited land allocation for DC projects
  • Stamp duty exemption: Reduced registration costs
  • Capital subsidy: 25% subsidy on fixed capital investment (capped)
  • Employment incentive: Reimbursement for local hiring

Voltage-Based Optimization

Telangana offers meaningful discounts for higher voltage connections:

Voltage Level Energy Rate Savings vs 11 kV Annual Savings (1 MW load)
11 kV ₹7.65/kVAh - -
33 kV ₹7.15/kVAh ₹0.50/kVAh ~₹43 Lakhs
132 kV+ ₹6.65/kVAh ₹1.00/kVAh ~₹86 Lakhs
Infrastructure Decision: For facilities above 10 MW, investing in 33 kV or 132 kV infrastructure pays for itself rapidly through the ₹0.50-1.00/kVAh discount.

Operational Recommendations

  1. Budget for higher opex Q4 FY26: The rebate removal is structural for winter and may recur in future years as renewable penetration increases
  2. Negotiate 33 kV connections: The ₹0.50/kVAh discount over 11 kV is significant for large facilities
  3. Maintain high PF: With kVAh billing, every 0.01 PF improvement reduces costs
  4. Plan for April relief: Night rebate should resume Apr 2026, restoring cost advantage

Try Our Calculator

Use our ToD Power Tariff Calculator to estimate your Telangana data center electricity costs. The calculator reflects the current February 2026 rates including the suspended night rebate.

Compare Other States

Sources

  • TSERC Retail Supply Tariff Order FY 2025-26
  • TSERC ToD Amendment (Winter Rebate Suspension, Dec 2025)
  • TGSPDCL HT-I(A) Industrial Schedule
  • Telangana Data Center Policy 2024
  • Telangana Electricity Duty Rules

Automate Your Power Billing